top of page

Unionized Ammonia and BOD Treatment; Sugar Shack de la Montagne; Detailed Engineering Phase

Updated: Jan 20, 2021

A Bionest advanced secondary biological wastewater system with pre-reactors and a weeping bed were required for this seasonal tourist attraction.


Sizing was one challenge for this client because of the large variation in flow rates, and fitting the system into the beautiful environment while cutting down a minimum of trees.





Location: Rigaud, Quebec, Canada



Comments


bottom of page